|
Pictures of Construction |
![]() |
Page 9 |
Goforth Media Under Construction
Ceiling Tile is finished
Ceiling Tile is finished
Goforth Media New studios and offices now have heat and air-conditioningEarlier units installed had to be replaced due to an engineering problem.
Goforth Media New studios and offices now have heat and air-conditioningEarlier units installed had to be replaced due to an engineering problem.![]()
![]()
![]()
Staff and families meet at new studios for dedication
![]()
Staff and families meet at new studios for dedication
![]()
Installing T1 lines at Power 88 transmitter site
![]()
Installing T1 lines at Power 88 transmitter site
Installing T1 lines at the new studios in Spanish Fort
Installing T1 lines at the new studios in Spanish Fort
The glass goes in
The glass goes in
Trough for control room wiring
Charlie sets up computer in new work area