Pictures of Construction

Home

Page 9

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Back  Next

Goforth Media new studios under construction 2006

Ceiling Tile is finished

Ceiling Tile is finished

Goforth Media New studios and offices now have heat and air-conditioning
 
Earlier units installed had to be replaced due to an engineering problem.
Goforth Media New studios and offices now have heat and air-conditioning
 
Earlier units installed had to be replaced due to an engineering problem.

Staff and families meet at new studios for dedication

Staff and families meet at new studios for dedication

Installing T1 lines at Power 88 transmitter site

Installing T1 lines at Power 88 transmitter site

Installing T1 lines at the new studios in Spanish Fort
Installing T1 lines at the new studios in Spanish Fort
 

The glass goes in

The glass goes in

Trough for control room wiring

Charlie sets up computer in new work area

Back  Next