|
Pictures of Construction |
![]() |
Page 10 |
Goforth Media Under Construction
sewage and water lines installed
sewage and water lines installed
![]()
Goforth Media Signs go on the glass
![]()
Goforth Media Signs go on the glass
![]()
Engineering work starts in the new Power 88 control room
![]()
Engineering work starts in the new Power 88 control room
First Goforth Media office opens in Spanish Fort![]()
Kitchen cabnets are being built in break room
![]()
![]()
![]()
Control Room Painting
![]()
Satellite Dish Construction
Satellite Dish Construction
Cleaning ceramic tile
To ground all the audio equipment in the control rooms andproduction rooms this copper pipe goes 20' in the ground.
To ground all the audio equipment in the control rooms andproduction rooms this copper pipe goes 20' in the ground.
Satellite Dish for network programming it put together.
Satellite Dish for network programming it put together.