Pictures of Construction

Home

Page 10

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Back  Next

Goforth Media new studies under construction 2006-7

sewage and water lines installed

sewage and water lines installed

Goforth Media Signs go on the glass

Goforth Media Signs go on the glass

Engineering work starts in the new Power 88 control room

Engineering work starts in the new Power 88 control room

 
First Goforth Media office opens in Spanish Fort

Kitchen cabinets are being built in break room

Control Room  Painting

Satellite Dish Construction

Satellite Dish Construction

Cleaning ceramic tile 

To ground all the audio equipment in the control rooms and
production rooms this copper pipe goes 20' in the ground.
 
To ground all the audio equipment in the control rooms and
production rooms this copper pipe goes 20' in the ground.

Satellite Dish for network programming it put together.
 
Satellite Dish for network programming it put together.

Back  Next