Pictures of Construction

Home

Page 7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Back  Next

Goforth Media Under Construction

Sprinkler system installed

Sprinkler system installed

Engineering room floor is painted

Bathroom fixtures installed

Water meter connected

 
Last 2 doors are finished
 
Getting ready for glass windows to go in control rooms

Getting ready for glass windows to go in control rooms

 
Jeff and Matt working on main power panel 

Floor installation started 

Floor installation started 

Back  Next