Pictures of Construction |
Page 7 |
Goforth Media studios under construction 2006
Sprinkler system installed
Sprinkler system installed
Engineering room floor is painted
Bathroom fixtures installed
Water meter connected
Last 2 doors are finisheGetting ready for glass windows to go in control rooms
Jeff and Matt working on main power panelFloor installation started
Floor installation started